CMF / CRF Details

CMF ID: 2030

Modify night-time flash operation period

Description: Changed the standard operating times for late night flash operations from 11:00 PM ? 6:00 AM to 12:00 AM ? 5:00 AM.

Prior Condition:  late night flash operations

Category: Intersection traffic control

Study: An Evaluation of the Safety Effects of Modifying Late Night Flash Signal Operations in North Carolina, Murphy, 2009

 
Star Quality Rating:3 Stars  [View score details]
Rating Points Total:90
Crash Modification Factor (CMF)
Value:0.88
Adjusted Standard Error:
Unadjusted Standard Error:0.12
Crash Reduction Factor (CRF)
Value:12  (This value indicates a decrease in crashes)
Adjusted Standard Error:
Unadjusted Standard Error:12
Applicability
Crash Type:All
Crash Severity:All
Roadway Types:Not Specified
Street Type:
Minimum Number of Lanes:
Maximum Number of Lanes:
Number of Lanes Direction:
Number of Lanes Comment:
Crash Weather:Not specified
Road Division Type:
Minimum Speed Limit:
Maximum Speed Limit:
Speed Unit:
Speed Limit Comment:
Area Type:
Traffic Volume:
Average Traffic Volume:
Time of Day:Night
If countermeasure is intersection-based
Intersection Type:Roadway/roadway (not interchange related)
Intersection Geometry:
Traffic Control:Signalized
Major Road Traffic Volume:
Minor Road Traffic Volume:
Average Major Road Volume :
Average Minor Road Volume :
Development Details
Date Range of Data Used:
Municipality:
State:NC
Country:
Type of Methodology Used:Before/after using empirical Bayes or full Bayes
Other Details
Included in Highway Safety Manual?No
Date Added to Clearinghouse:Dec 01, 2009
Comments: