CMF / CRF Details

CMF ID: 5217

Increase work zone duration

Description: Increase work zone duration

Prior Condition:  No Prior Condition(s)

Category: Work zone

Study: Effects of Work Zone Presence on Injury and Non-Injury Crashes, Khattak and Council, 2002

 
Star Quality Rating:Cannot Be Rated (HSM)
Rating Points Total:
Crash Modification Factor (CMF)
Value:Equation
Adjusted Standard Error:
Unadjusted Standard Error:
Crash Reduction Factor (CRF)
Value:
Adjusted Standard Error:
Unadjusted Standard Error:
Applicability
Crash Type:All
Crash Severity:All
Roadway Types:Principal Arterial Interstate
Street Type:
Minimum Number of Lanes:
Maximum Number of Lanes:
Number of Lanes Direction:
Number of Lanes Comment:
Crash Weather:Not specified
Road Division Type:
Minimum Speed Limit:
Maximum Speed Limit:
Speed Unit:
Speed Limit Comment:
Area Type:
Traffic Volume:Minimum of 4000 to Maximum of 237000 Annual Average Daily Traffic (AADT)
Average Traffic Volume:
Time of Day:
If countermeasure is intersection-based
Intersection Type:
Intersection Geometry:
Traffic Control:
Major Road Traffic Volume:
Minor Road Traffic Volume:
Average Major Road Volume :
Average Minor Road Volume :
Development Details
Date Range of Data Used:
Municipality:
State:
Country:
Type of Methodology Used:Not specified
Other Details
Included in Highway Safety Manual?Yes
Date Added to Clearinghouse:Mar 22, 2013
Comments:HSM 1st Ed, page 16-6. This CMF is based on work zone durations from 16 to 714 days.